Super User

Ammico’s scope of work on the project comprised of installation of Stone Columns. The following works were undertaken by Ammico:

Project Scope 

Work descriptionUnitQuantity
Total number of columns nos 200
Dia of the column mm 1,000
Depth mtrs 9

Ammico’s scope of work on the project comprised of Installation of stone columns. The following works were undertaken by Ammico:

Project Scope 

Work description

Unit

Quantity

Total number of Columns

nos

30,000

Dia of Column

mm

1,000

Depth

mtrs

7.5

 

The Sports Marina District is planned to become an energetic and youthful destination for water sports at Doha Port area.

Ammico’s scope of work on the project comprised of installation of reinforced concrete pile and steel tubular piles at sports marina. The following works were undertaken by Ammico:

·         Installation of fifty (24) RCC piles of Ø 1200mm with permanent steel casing of 10mm wall thickness for fixed decks and boat hoist structure. 

·         Installation of eighty-three (83) Steel tubular piles of Ø 457mm for the floating pontoons.

Work Description

Unit

Quantity

Installation of  Off-shore reinforced concrete vertical piles with permanent casing  of  1200mm and 30 m length

No

24

Installation of  Off-shore steel tubular piles of  457mm and 22 m length

No

83

 

Doha Old Port is a pioneer port in the State of Qatar and it is located at Doha. Due to the increasing number of tourists arriving in cruise ships Ministry of Transport and Communication took measures to facilitate the passengers' disembarkation process and entry procedures. It is required to deepen the existing channel and maneuvering area and as well as construction of breasting and mooring dolphins to extent the existing berths. 

Ammico’s scope of work on the project comprised of construction of dolphins and walkways. The following works were undertaken by Ammico:

• Installation of offshore vertical and raked piles with 1200 mm diameter.
• Construction of breasting and mooring dolphins
• Walkway fabrication and installation between dolphins and existing berth
• Installation of fender and bollard

Project Scope

Work Description

Unit

Quantity

Installation of  Off-shore reinforced concrete raked Piles (1/4) with permanent casing  of  1200mm and 31.20 m length

No

16

Installation of  Off-shore reinforced concrete vertical piles with permanent casing  of  1200mm and 31.20 m length

No

08

Mooring Dolphin

No

02

Breasting Dolphin

No

01

Walkway fabrication and installation between dolphins and existing berth

 

 

Information will be updated soon

Following are the Awards given to AMMICO CONTRACTING:



 



 


 


 


 


 

 


Date: 10-November-2020
Ammico Contracting Co. W.L.L. has been awarded Pile Foundation Works, Solar IPP at Al Kharassa by Main Contractor Power China Ghuizhou Engineering and Client Kahrammaa / Siraj in Qatar.


Date: 18-February-2020
Ammico Contracting Co. W.L.L. has been awarded Diaphram Wall & Piling Works at Hamad International Airport by Main Contractor Midmac-TAV-Taisei JV in Qatar.


Date: 17-October-2019
Ammico Contracting Co. W.L.L. has signed MOU with Hyundai Engineering & Construction Co. Ltd for Global Strategic Partnership.


Date: 13-October-2019 
Letter of Appreciation by National Industrial Constructing Company.

 


Date: 04-February-2019 
Ammico Contracting Co. W.L.L. has been awarded Enabling Works Package (Shoring, Excavation & Dewatering Works) at Lusail by Lusail Real Estate Development in Qatar.


Date: 19-July-2018
Ammico Contracting Co. W.L.L. has been awarded Construction of Mooring Structures and Removal of Offshore Beacon at Doha Port for Doha Port Re-Development Marine Works - Dredginig and Aids to Navigation by MEDCO-Jan De Nul Dredging Ltd in Qatar.


Date: 14-June-2018
Ammico Contracting Co. W.L.L. has been awarded Enabling Works Package at Lusail for Alar Hotel Development at QEC by Al Jasrah Real Estate Development W.L.L. in Qatar.


Date: 13-May-2018
Ammico Contracting Co. W.L.L. has been awarded Enabling Works Package at Lusail for QEWC-Commercial Development Marina District Com 53 in Qatar.


Date: 20-February-2018
Ammico Contracting Co. W.L.L. has been awarded Piling & Excavation works at Doha Port Re-Development Project for Mina Basin Cut Package in Qatar.


Ammico organized Qatar Senior Open 2018 golf tournament on 23 March at Qatar Golf Course - Lusail.


Date: 15-February-2018
Ammico Foundations L.L.C successfully conducted Compression Load Test of 4000 MT using Reaction System at R1048/2-Improvement of
Expo 2020 Roads Network
for client RTA and main contractor China State Construction in UAE.

 


Date: 10-January-2018
Ammico Foundation L.L.C has been awarded Installation of diaphragm wall at SEVEN RESIDENCES for client AL MEMZAR INVESTMENT CO. (LLC) and main contractor AIROLINK in UAE.


Date: 18-October-2017
Ammico Int'l Contracting Co. Ltd. has been awarded Durrah Sugar Refinery Project - Piling Works Gallery A-Frame at Yanbu for TSK Saudi Arabia Co. Ltd in Saudi Arabia.


Date: 06-August-2017
Ammico Contracting Co. W.L.L. has been awarded Enablinlg Works Package at Lusail for Masraf Al Rayan Head Office Building in Qatar.


Ammico organized Qatar Senior Open 2017 golf tournament on 16 March at Qatar Golf Course - Lusail. 

 


Date: 28-April-2016
Letter of appreciation by Supreme Committee for Delivery & Legacy.

  


Ammico organized Qatar Senior Open 2016 golf tournament on 28 April at Qatar Golf Course - Lusail.

 

  


Date: 29-October-2015
Ammico Contracting Co. W.L.L. has signed MOU with SAMSUNG C&T Corporation for Global Strategic Partnership.



Date: 11-August-2015
Letter of appreciation by Qatar Rail - Major Stations.

 

 


 Dewar, Guevel win QGL Ammico Trophy

Steve Dewar teaming up with Serge Guevel emerged victorious in the Ammico Trophy golf tournament organised by Qatar Golf Lovers over the weekend at the Doha Golf Club. 84 golfers participated in the event which was sponsored by Sal Contracting Company.

Pavan Singh and Gavin Daley were declared the runner up. Sheji Valiyakath won the ‘longest putt’, PK Mathew won the ‘closest to pin’, Adrian Usher won the ‘longest drive’, and CK Krishnan won the ‘closest to rope’ prizes. Special prizes were won by Khalid Ansari, Michael Saretsky, Fazala Kazi and Joe Conway.

Jamal Nasir and Fazal Kazi, Managing Partners of Sal Contracting company hosted a prize distribution dinner for all golfers and their spouses later in the evening at the Doha Golf Club and gave away prizes to the winners.

 

The project comprised of construction of private jetty at Al Jassasiya, North of Ras Laffan. Ammico’s undertook installation of marine piles for this jetty.

Project Scope

Work DescriptionUnitQuantity
Installation of marine piles of 500mm diameter and 12m length No 39
Page 3 of 7