Ammico’s scope of work included soil improvement through the installation of stone columns. The objective of the soil improvement was to enhance the load-bearing capacity of the soil and to limit settlement within the specified tolerances under building loads.
A total of 3,000 stone columns, each 1.0 m in diameter, were installed to a maximum depth of 7.5 m below ground level.
CLIENT
Al Qudra Holding P.J.S.C.
MAIN CONTRACTOR
Al Amry Transport & General Contracting LLC
LOCATION
Abu Dhabi, UAE
SOLUTIONS
- Ground Improvement
- Stone Columns
START DATE
May 2018
COMPLETION DATE
August 2021