CMC Work at Jubail 3A Independent Water Project, KSA Ammico’s scope of work included ground improvement for different structures using Controlled Module Columns (CMC). > 8000 nos. of CMC installed > 4500 cm of CMC > 22 ZLT, 110 PLT CLIENT Jazlah MAIN CONTRACTOR Shandong Tiejun Electric Power Engineering Co.,…
Riyadh Metro Lines 3, 5, & 6 Cut & Cover Tunnel and Deep Stations, KSA Ammico’s scope of work comprised the design and construction of piling and shoring systems for cut-and-cover tunnels and deep stations along Lines 3, 5, and 6 of the Riyadh Metro Project. This included secant piles,…
Construction of Dolphins for Cruise Terminal at Doha Port, Qatar With the increasing number of tourists arriving by cruise ships, the Ministry of Transport and Communications initiated measures to facilitate passenger disembarkation and streamline entry procedures. The project involved deepening of the existing navigation channel and maneuvering area, as well…
Durrah Sugar Refinery – Ground Improvement Work (Stone Column) – Yanbu, KSA Ammico’s scope of work included soil improvement through the installation of stone columns. The objective of the soil improvement was to enhance the load-bearing capacity of the soil and to control settlement within the specified limits under building…
Al Morouna Beach House Jetty, Qatar The project is located in Al Morouna Village, approximately 90 km north of Doha. Ammico’s scope of work comprised the construction of a recreational jetty, including the installation of marine piles with a diameter of 508 mm. The facility is designed to accommodate small…
The Heart Of Europe, The World Islands, Dubai – Vibro Compaction Works Ammico’s scope of work included soil improvement through vibrocompaction. The objective of the works was to mitigate the potential for soil liquefaction and to enhance the bearing capacity of the ground. The improvement was carried out to a…
SONY DSC SONY DSC SONY DSC Doha Convention Center & Tower Project (2B/3B+G+110 Stories) Ammico’s scope of work included the design and installation of diaphragm walls, excavation, dewatering, and piling works. The major quantities and activities executed under this scope included the following: > Construction of diaphragm walls, 800 mm…
Banana Island Holiday Resort, Qatar Banana Island Resort is a world class leisure resort about 3 km east of Doha. Ammico undertook the installation of marine and sheet piles. Work Description Unit Quantity Installation of marine piles of diameter 475 mm for overwater villas and walkways No 62 Installation of marine piles of diameter…
RIC Work at Jafurah Gas Field Site Preparation, KSA Ammico’s scope of work included area preparation for around 15,000,000 sqm. CLIENT Aramco MAIN CONTRACTOR Hyundai, Samsung LOCATION Jafurah, KSA SOLUTIONS Ground Improvement CMC Work Year 2021
Diaphragm Wall Shafts for Stormwater Line Project at Qassim, KSA Ammico’s scope of work included the installation of diaphragm walls for 13 shafts. The diaphragm walls were constructed with a thickness of 1.0 m and panel depths ranging from 30 m to 58 m. CLIENT Qassim Municipalty, KSA Main Contractor…