The Abu Hamour Surface and Ground Water Tunnel Project is one of the major drainage infrastructure initiatives undertaken by Ashghal to enhance Qatar’s stormwater and groundwater management network. The tunnel extends from Abu Hamour to a pumping station located near the coast, close to Hamad International Airport.
Ammico’s scope of work comprised the construction of a plastic bentonite–concrete cut-off wall designed to prevent the lateral ingress of groundwater during excavation for the pumping station.
Installation of the cut-off wall included:
- > Construction of a 0.640 m thick cut-off wall to a depth of up to 36 m
- > Total installed wall length: 492 m
Salini Impregilo S.p.A
Ammico International Contracting Co. Ltd.
Doha, Qatar
December 2014
February 2015
Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.
Work Description | Unit | Quantity |
Installation of marine piles of diameter 900 mm. | No | 48 |
Length | m | 15.1 |
Diameter | mm | 22.5 |