Ground Improvement

Stone Columns Works at Traditional Souq Project, UAE

Traditional Souq Project, UAE

Ammico Scope of work included soil improvement using stone columns. The objective of soil improvement was to increase the load carrying capacity of soil & keep the settlement under building loads under the specified limits. There were 3000 no. stone columns of 1.0 m diameter installed to a maximum depth of 7.5 m from ground level.

 

Project Data Sheet

CLIENT

Al Qudra Holding P.J.S.C.

MAIN CONTRACTOR

Al Amry Transport & General Contracting LLC

LOCATION

Abu Dhabi, UAE

SOLUTIONS

Ground Improvement

Stone Columns

Year

2018

CMC Work at Jubail 3A Independent Water Project, KSA

CMC Work at Jubail 3A Independent Water Project, KSA

Ammico Scope of work included Ground Improvement for different structure using CMC.
* 8000 nos. of CMC installed.
* 4500 cm of CMC.
* 22 ZLT, 110 PLT.

CLIENT

Jazlah

MAIN CONTRACTOR

Tiejun

LOCATION

Jubail, KSA

SOLUTIONS

Ground Improvement

CMC Work

Year

2021

Stone Column Works at Durrah Sugar Refinery – Yanbu, KSA

Durrah Sugar Refinery – Ground Improvement work (Stone Column) – Yanbu, KSA , KSA

Ammico Scope of work included soil improvement using stone columns. The objective of soil improvement was to increase the load carrying capacity of soil & keep the settlement under building loads under the specified limits. There were 390 no. stone columns of 1.0 m diameter installed to a maximum depth of 18 m from ground level.

Project Data Sheet

CLIENT

Durrah Advanced Development Co

Main Contractor

TSK

LOCATION

Yanbu, KSA

SOLUTIONS

Ground Improvement

Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.

Work Description

Unit

Quantity

Installation of marine piles of diameter 900 mm.

No

48

Length

m

15.1

Diameter

mm

22.5

   

Vibro Compaction Works at The Heart Of Europe, The World Islands, Dubai

The Heart Of Europe, The World Islands, Dubai – Vibro Compaction Works

Ammico scope of work included soil improvement using vibrocompaction works. The objective was to mitigate the liquefaction potential & increase the soil bearing capacity. Total improvement was carried out up to a maximum depth of 17 m & the treated soil volume was 1,000,000 cum.

Project Data Sheet

CLIENT

Nakheel

Main Contractor

Macro Contracting LLC.

LOCATION

Dubai, UAE

SOLUTIONS

Ground Improvement

Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.

Work Description

Unit

Quantity

Installation of marine piles of diameter 900 mm.

No

48

Length

m

15.1

Diameter

mm

22.5

   

Stone Column Works ar Desalination Plant- Kalba- UAE

Desalination Plant- Kalba- UAE

Ammico Scope of work included soil improvement using stone columns. The objective of soil improvement was to increase the load carrying capacity of soil & keep the settlement under building loads under the specified limits. There were 135 no. stone columns of 1.0 m diameter installed to a maximum depth of 8 m from ground level.

Project Data Sheet

CLIENT

Alpha Utilities Project FZE

Main Contractor

Enmaa Engineering Consultants

LOCATION

Kalba, UAE

SOLUTIONS

Ground Improvement

Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.

Work Description

Unit

Quantity

Installation of marine piles of diameter 900 mm.

No

48

Length

m

15.1

Diameter

mm

22.5

   

Vibro Compaction Works at The Palm Gate Way Tower, Palm Jumeriah, Dubai

The Palm Gate Way Tower, Palm Jumeriah, Dubai

Ammico scope of Work included soil improvement using vibrocompaction. The objective was to increase the soil bearing capacity & reduce the expected settlements under design loads. The total improvement volume was approximately 53,000 cum.

Project Data Sheet

CLIENT

The Palm Jumeriah L.L.C

Main Contractor

Shapoorji Pallonji Mideast L.L.C.

LOCATION

Jumeirah, UAE

SOLUTIONS

Ground Improvement

Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.

Work Description

Unit

Quantity

Installation of marine piles of diameter 900 mm.

No

48

Length

m

15.1

Diameter

mm

22.5

   

Stone Column Works at Business Bay, Dubai, UAE

Ground Improvement Works – for Proposed Down Town Residential Tower on Plot no. 345-0423, Business Bay, Dubai, UAE

Ammico scope of work included soil improvement using installation of stone Columns. The objective of soil improvement was to mainly mitigate the liquefaction potential of soil. The work involved installation of 328 no’s of stone columns to a maximum depth of 7.0 m.

Project Data Sheet

CLIENT

Line Investments & Property L.L.C.

Main Contractor

HSSG Foundation Contracting L.L.C

LOCATION

Dubai, UAE

SOLUTIONS

Ground Improvement

TAGS

UAE, Ground Improvement

Ammico scope of works include supply and installation of Marine Pilling Works for Glulam Beam & Wooden Decking and Steel Tubular piles.

Work Description

Unit

Quantity

Installation of marine piles of diameter 900 mm.

No

48

Length

m

15.1

Diameter

mm

22.5