Micro Piling at 800 MW Solar PV Ammico’s scope of work compromised of installation of around 117,000 micro piles of 500mm diameter and 1.5m depth. CLIENT Kahrammaa / Siraj 1 MAIN CONTRACTOR Power China Ghuizhou Engineering LOCATION Al Kharsaah, Qatar SOLUTIONS Foundation Engineering Micro Piling START DATE November 2020 COMPLETION…
Main Sewerage Transmission Line Project Ammico’s scope of work included installation of a diaphragm wall for 18 shafts. CLIENT Qassim Municipalty, KSA Main Contractor Thrustboring Construction Co. (TCC) LOCATION Buraidah – Qassim, KSA SOLUTIONS Foundation Engineering Diaphragm Wall START DATE December 2019 COMPLETION DATE December 2021 Ammico scope of works…
Abraj Quartier 3, 4, 5 & 6 – The Pearl, Qatar The project is located in The Pearl, Qatar, with a total plot area of approximately 60,000 m². The development comprises four towers, each consisting of one basement level and forty storeys. Ammico’s scope of work included the installation of…
Shuqaiq 4 SWRO Desalination Plant, KSA Ammico’s scope of work included the construction of diaphragm walls, installation of ground anchors, and execution of deep excavation works for the pumping station. CLIENT SWCC Main Contractors Acciona Agua S.A and Al Rashid Trading Contracting (JV) LOCATION Shuqaiq, KSA SOLUTIONS Foundation Engineering Diaphragm…
Cut-Off Wall for Pumping Station Near Hamad International Airport – Qatar The Abu Hamour Surface and Ground Water Tunnel Project is one of the major drainage infrastructure initiatives undertaken by Ashghal to enhance Qatar’s stormwater and groundwater management network. The tunnel extends from Abu Hamour to a pumping station located…
Al Quds Tower Project, Qatar (5B + G + 100 Storeys) The Al Quds Tower project is located in West Bay, Doha, with a total plot area of approximately 17,937 m². The development consists of five basement levels, a ground floor, and one hundred storeys. Ammico’s scope of work comprised…
Qatar National Bank Headquarters Tower Project (5B+G+105 Storeys) Ammico’s scope of work comprised the design and installation of the shoring system, piling, excavation, and dewatering for the basement structure. The principal components of the works were as follows: > Construction of diaphragm walls, 800 mm thick and 29 m deep,…
King Salman International Complex for Maritime Industries and Services Project, KSA Ammico’s scope of work included the installation of bored cast-in-situ piles. CLIENT Aramco Main Contractor Sepco Arabia Company LOCATION Ras Al Khair, KSA SOLUTIONS Foundation Engineering Bored Cast-In-Situ Piling START DATE September 2020 COMPLETION DATE April 2021 Ammico scope…
Woqod Tower Project (4B+G+25 Storeys) Ammico’s scope of work included the installation of diaphragm wall, excavation, dewatering and piling works. CLIENT Qatar Fuel Company MAIN CONTRACTOR Romatre Projects LOCATION West Bay – Doha, Qatar SOLUTIONS Foundation Engineering Enabling Works START DATE November 2007 COMPLETION DATE March 2008 Ammico scope of…
Green Hydrogen Project – Neom, KSA Ammico’s scope of work comprised the installation of preliminary test piles, performance of static load tests, lateral load tests, and integrity testing to verify pile capacity and performance parameters in accordance with project specifications. CLIENT Air Products Middle East Industrial Gases LOCATION Neom, KSA…