Qatar Integrated Metro Project – Gold Line Ammico’s scope of work involved installing ground anchors and a diaphragm wall with lengths between 88 and 350 meters, depth of 32–55 m, and thickness of 800–1000 mm. CLIENT Qatar Rail LOCATION Doha, Qatar SOLUTIONS Diaphragm Wall Ground Anchors START DATE July 2014…
Passenger Terminal Expansion HIA Ammico’s scope of work involved installing a diaphragm wall with a length of 356 m, depth of 26.5 m, and thickness of 1200 mm. The piling works involved installing 670 piles of diameter 600–1500 mm in diameter and 17–27m in depth. CLIENT HIAEPSC MAIN CONTRACTOR Midmac-TAV-Taisei…
Diaphragm Wall Work for North Jeddah Pumping Station Project, KSA Ammico’s scope of work includes installation of diaphragm wall for circular shafts of 44m diameter and 77m depth including: > Drilling of diaphragm wall using BC-40 cutters > Verifying verticality of drilling using KODEN > Lowering of steel reinforcement cages…
Doha Metro – Musheireb Station, Qatar Musheireb Station, located in the heart of downtown Doha, serves as the central interchange hub of the Doha Metro network and is one of the largest underground transit facilities of its kind. The project was executed by a consortium comprising Samsung C&T, Obrascon Huarte…
SONY DSC SONY DSC SONY DSC Doha Convention Center & Tower Project (2B/3B+G+110 Stories) Ammico’s scope of work included the design and installation of diaphragm walls, excavation, dewatering, and piling works. The major quantities and activities executed under this scope included the following: > Construction of diaphragm walls, 800 mm…
Diaphragm Wall Shafts for Stormwater Line Project at Qassim, KSA Ammico’s scope of work included the installation of diaphragm walls for 13 shafts. The diaphragm walls were constructed with a thickness of 1.0 m and panel depths ranging from 30 m to 58 m. CLIENT Qassim Municipalty, KSA Main Contractor…
Main Sewerage Transmission Line Project Ammico’s scope of work included installation of a diaphragm wall for 18 shafts. CLIENT Qassim Municipalty, KSA Main Contractor Thrustboring Construction Co. (TCC) LOCATION Buraidah – Qassim, KSA SOLUTIONS Foundation Engineering Diaphragm Wall START DATE December 2019 COMPLETION DATE December 2021 Ammico scope of works…
Shuqaiq 4 SWRO Desalination Plant, KSA Ammico’s scope of work included the construction of diaphragm walls, installation of ground anchors, and execution of deep excavation works for the pumping station. CLIENT SWCC Main Contractors Acciona Agua S.A and Al Rashid Trading Contracting (JV) LOCATION Shuqaiq, KSA SOLUTIONS Foundation Engineering Diaphragm…
Cut-Off Wall for Pumping Station Near Hamad International Airport – Qatar The Abu Hamour Surface and Ground Water Tunnel Project is one of the major drainage infrastructure initiatives undertaken by Ashghal to enhance Qatar’s stormwater and groundwater management network. The tunnel extends from Abu Hamour to a pumping station located…
Al Quds Tower Project, Qatar (5B + G + 100 Storeys) The Al Quds Tower project is located in West Bay, Doha, with a total plot area of approximately 17,937 m². The development consists of five basement levels, a ground floor, and one hundred storeys. Ammico’s scope of work comprised…