Category: Bored Cast-In-Stu Piling

Shaura Island Piling Works at the Red Sea, KSA

default Shaura Island Piling Works for Red Sea Project, KSA The scope of works includes the Enabling Works Package and the installation of 1,174 piles of 800 mm diameter and lengths ranging from 14 m to 21 m. The works also comprise: > pile head breaking > compression load testing…

Doha Metro – Musheireb Station, Qatar

Doha Metro – Musheireb Station, Qatar Musheireb Station, located in the heart of downtown Doha, serves as the central interchange hub of the Doha Metro network and is one of the largest underground transit facilities of its kind. The project was executed by a consortium comprising Samsung C&T, Obrascon Huarte…

Enabling Works at Doha Convention Center & Tower Project, Qatar

SONY DSC SONY DSC SONY DSC Doha Convention Center & Tower Project (2B/3B+G+110 Stories) Ammico’s scope of work included the design and installation of diaphragm walls, excavation, dewatering, and piling works. The major quantities and activities executed under this scope included the following: > Construction of diaphragm walls, 800 mm…

Abraj Quartier 3, 4, 5 & 6, The Pearl Qatar

Abraj Quartier 3, 4, 5 & 6 – The Pearl, Qatar The project is located in The Pearl, Qatar, with a total plot area of approximately 60,000 m². The development comprises four towers, each consisting of one basement level and forty storeys. Ammico’s scope of work included the installation of…

Al Quds Tower Project, Qatar

Al Quds Tower Project, Qatar (5B + G + 100 Storeys) The Al Quds Tower project is located in West Bay, Doha, with a total plot area of approximately 17,937 m². The development consists of five basement levels, a ground floor, and one hundred storeys. Ammico’s scope of work comprised…

Qatar National Bank Headquarters Tower Project, Qatar

Qatar National Bank Headquarters Tower Project (5B+G+105 Storeys) Ammico’s scope of work comprised the design and installation of the shoring system, piling, excavation, and dewatering for the basement structure. The principal components of the works were as follows: > Construction of diaphragm walls, 800 mm thick and 29 m deep,…

Enabling Works at Woqod Tower Project, Qatar

Woqod Tower Project (4B+G+25 Storeys) Ammico’s scope of work included the installation of diaphragm wall, excavation, dewatering and piling works. CLIENT Qatar Fuel Company MAIN CONTRACTOR Romatre Projects LOCATION West Bay – Doha, Qatar SOLUTIONS Foundation Engineering Enabling Works START DATE November 2007 COMPLETION DATE March 2008 Ammico scope of…

Neom Green Hydrogen Project, KSA

Green Hydrogen Project – Neom, KSA Ammico’s scope of work comprised the installation of preliminary test piles, performance of static load tests, lateral load tests, and integrity testing to verify pile capacity and performance parameters in accordance with project specifications. CLIENT Air Products Middle East Industrial Gases LOCATION Neom, KSA…

Ishbiliya City Center Riyadh , KSA

Previous Next Ishbiliya City Center Riyadh , KSA Ammico Scope of work included Installation of Bored Cast In-Stu Piles, Testing works (Compression, tension, Lateral Load Test, Integrity Test and Dynamaic Test. CLIENT Majid Al Futaim/ UNEC LOCATION Riyadh, KSA SOLUTIONS Foundation Engineering Ammico scope of works include supply and installation…