Located in the heart of West Bay Doha, this world class high rise commercial development called for construction of three level basement over a plot area of 24,000 m2.
Ammico was assigned the complete enabling works package which included design and construction of seven hundred meters of diaphragm wall and associated ground anchors along the project perimeter, excavation to depths of up to 15 m, dewatering works and design and installation of foundation piles of 900 mm and 1200 mm diameter.
Project Scope
Work Description | Unit | Quantity |
---|---|---|
Diaphragm wall 800 mm | m | 700 |
Ground anchors | No | 700 |
Foundation piles of 900 mm dia. | No | 607 |
Foundation piles of 1200 mm dia. | No | 73 |
Excavation | m3 | 300,000 |
Dewatering | m2 | 24,000 |