Jetty Boil off Gas Recovery Project

Jetty Boil-off Gas Recovery (JBOG) Project has been implemented to eliminate flaring at the LNG terminal at Ras Laffan Industrial City by recovering and saving natural gas which was being burnt and thus also reducing greenhouse gas emissions. The main shareholders of the project are Qatar Petroleum, ExxonMObil, Total, ConocoPhillips and Sheel Shell and the facility shall be operated by Qatargas and RasGas.

The project site is in Ras Laffan Industrial City’s port area and Ammico’s scope consisted of installation of around 1000 m of secant pile wall and about 1,500 number bored cast in-situ foundation piles of 900 mm diameter. As the project site was in the vicinity of very important live LNG and other oil and gas terminals and facilities, the works were executed under very stringent safety standards.

Project Scope

Work DescriptionnitQuantity
Foundation piles 900 mm m 1,493
Secant piles 600 mm diameter @ 450mm c/c m 1,093
  • CLIENT Qatar Gas
  • Client Image Client Image
  • Year 2011